Rapid prototyping
To help develop this article, click 'Edit this article' above.
A recent technology, since the 1980s this has been an important asset for countless industries and projects that need an extra level of rendering to enhance work done.
An additive process – rapid prototyping uses materials such as adhesives and photopolymers – by joining particles and layers of raw materials together to create the desired shape. It differs from more traditional processes, which typically compress and subtract rather than add.
First, a virtual 3D model must be created using CAD software. This digital rendering is a simulation of the final product. The design is then converted so that the prototype can be printed as efficiently and accurately as possible – allowing the printer to interpret the design in a language it understands. Checks are needed throughout the process to ensure no mistakes are made during printing.
There are a number of benefits of rapid prototyping:
- Short turnarounds.
- Accuracy ensured before the final product is constructed.
- Cost-efficient.
- High-quality product.
- It can produce small parts and cavities.
- It allows issues to be corrected at the beginning of the process rather than carrying them into the final product.
- It is 'eco-friendly' as it generates less waste.
See also additive manufacturing.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.